Military Access, Mobility & Safety Improvement Project

Transportation

Connecting the Pikes Peak region's military installations.

The Military Access, Mobility & Safety Improvement Project (MAMSIP) is a $161 million, five-year program to improve the corridors connecting Fort Carson, Peterson Space Force Base, Schriever Space Force Base, and Cheyenne Mountain Space Force Station — funded by CDOT, El Paso County, the Pikes Peak Rural Transportation Authority, and an $18.35 million federal BUILD grant. Built by SEMA Construction from June 2021 to July 2026, the program delivered safety improvements and a jug-handle intersection on CO 94; a full rebuild of Charter Oak Ranch Road with a new roundabout at Santa Fe Avenue; 7.5 miles of I-25 work between South Academy Boulevard and Fountain, including two replacement bridges, a concrete overlay, and a full-length median barrier; and finally the widening of South Academy Boulevard from two to three lanes in each direction, with bridge widening over Fountain Creek, US 85/87, and Bradley Road.

Vivid Engineering served as the lead materials quality assurance testing firm for the program, overseeing all materials documentation, field testing, and inspection — including the South Academy Boulevard widening in El Paso County — to verify that every element met CDOT and FHWA standards for safety and durability.

Project Details

  • Contractor

    SEMA Construction

  • Location

    Pikes Peak region, including El Paso County

  • Project Value

    $161 million

  • Timeline

    June 2021 – July 2026

  • Sector

    Transportation

  • Services

    Construction Inspection & Testing

  • Transportation

    30th Street Corridor

    30th Street, Fontanero Street to Garden of the Gods Road, Colorado Springs, CO

    30th Street is the main route into Garden of the Gods Park, carrying park visitors, neighborhood traffic, and cyclists on a narrow, winding two-lane road with little margin for error. The City of Colorado Springs' 30th Street Corridor Improvement Project rebuilt roughly three miles between Mesa Road and Fontanero Street: widening the roadway with paved multi-use shoulders, adding a roundabout at Gateway Road, upgrading intersections, building a pedestrian underpass, and installing a new storm sewer system with a water quality pond. More than 2,000 feet of retaining walls and 6,300 feet of soldier pile were needed to hold the widened road on the hillside. Vivid Engineering led quality assurance testing and served on the construction inspection team for the project, verifying soils, concrete, and asphalt — including some 14,000 tons of asphalt and 21,000 feet of curb and gutter — against project specifications. The improvements strengthened emergency access and evacuation routes and created safer travel for motorists, cyclists, and pedestrians on the way into one of the region's most visited parks.

  • Transportation

    Academy Boulevard Improvements

    South Academy Boulevard, Bijou Street to Airport Road, Colorado Springs, CO

    South Academy Boulevard is one of Colorado Springs' hardest-working arterials, and decades of heavy traffic had left its pavement, concrete, and drainage in poor condition. The City's $62.5 million South Academy Boulevard Improvements Project, funded through the voter-approved Pikes Peak Rural Transportation Authority, is rebuilding 18 lane miles in two segments — Bijou Street to Airport Road, and East Fountain Boulevard to Jet Wing Drive. The work replaces worn pavement and base, rebuilds curb and gutter, adds a multi-use path, relocates Colorado Springs Utilities water and wastewater lines, and installs new inlets, manholes, and storm pipe to end chronic standing water. Vivid Engineering leads quality assurance testing and is part of the inspection team for the project. Our technicians sample and test soils, aggregate base, concrete, and asphalt as each phase goes in, keeping results in the contractor's hands so work can keep moving through a corridor that stays open to traffic throughout construction. Segment 1 wrapped up in 2024, with the southern segment scheduled for completion in 2026.

  • Transportation

    2C Road Improvement

    Citywide road program, Colorado Springs, CO

    In 2015, Colorado Springs voters approved the 2C sales tax to tackle a backlog of failing streets, and they renewed it in 2019 and again in 2024. Since the program began in 2016 it has repaved more than 1,900 lane miles, rebuilt roughly 400 miles of curb and gutter, and installed thousands of new and retrofitted pedestrian ramps across the city — one of the largest sustained paving efforts in Colorado, with about half of every dollar going to the concrete beside the road. Vivid Engineering serves as one of the lead quality assurance testing firms for the program's concrete and asphalt work. Our technicians test and document paving, sidewalks, curbs, gutters, and pedestrian ramps across each year's project list, verifying that every placement meets City specifications. That oversight protects the long-term durability of the investment and helps the City deliver smoother streets and better accessibility, year after year.