Academy Boulevard Improvements

Transportation

Rebuilding 18 lane miles of a workhorse arterial.

South Academy Boulevard is one of Colorado Springs’ hardest-working arterials, and decades of heavy traffic had left its pavement, concrete, and drainage in poor condition. The City’s $62.5 million South Academy Boulevard Improvements Project, funded through the voter-approved Pikes Peak Rural Transportation Authority, is rebuilding 18 lane miles in two segments — Bijou Street to Airport Road, and East Fountain Boulevard to Jet Wing Drive. The work replaces worn pavement and base, rebuilds curb and gutter, adds a multi-use path, relocates Colorado Springs Utilities water and wastewater lines, and installs new inlets, manholes, and storm pipe to end chronic standing water.

Vivid Engineering leads quality assurance testing and is part of the inspection team for the project. Our technicians sample and test soils, aggregate base, concrete, and asphalt as each phase goes in, keeping results in the contractor’s hands so work can keep moving through a corridor that stays open to traffic throughout construction. Segment 1 wrapped up in 2024, with the southern segment scheduled for completion in 2026.

Project Details

  • Client

    City of Colorado Springs

  • Location

    South Academy Boulevard, Bijou Street to Airport Road – Colorado Springs, CO

  • Project Value

    $62.5 million

  • Timeline

    Segment 1: 2023 – 2024 | Segment 2: 2023 – 2026

  • Sector

    Transportation

  • Services

    Construction Inspection & Testing

  • Transportation

    I-70 Floyd Hill to Chief Hosa Resurfacing

    I-70, Chief Hosa to Floyd Hill (MP 246.5 to 252.9), Jefferson and Clear Creek counties, CO

    Between Floyd Hill and Chief Hosa, I-70 climbs through the Front Range foothills carrying ski traffic, freight, and daily commuters in and out of the mountains — and its pavement had reached the end of its life. CDOT's $12.8 million resurfacing project rehabilitated 6.4 miles of the interstate (MP 246.5–252.9) through Jefferson and Clear Creek Counties, milling off deteriorated pavement and repaving both directions in stone matrix asphalt (SMA) — the durable, rut-resistant surfacing CDOT reserves for its hardest-working corridors. With no practical detour around this stretch of the mountains, contractor APC Construction completed all paving in a single season, almost entirely under nighttime lane closures, then returned the following season for guardrail replacement, culvert cleaning, signage, and striping. Working directly for CDOT, Vivid Engineering Group provided construction inspection, QA/QC administration, and field and laboratory owner acceptance materials testing across the project. SMA is one of the most demanding mixes to test — gap-graded, fiber-stabilized, and unforgiving on volumetrics — so Vivid ran the entire laboratory acceptance program from its on-site field lab, turning results while the mat was still going down. Vivid inspectors and certified technicians worked the night closures alongside the paving crews, verifying mix temperatures, compaction, and placement in real time; high-altitude paving windows, mountain weather, and live interstate traffic made every shift count, and Vivid's team kept acceptance testing and documentation moving on the contractor's schedule so the corridor reopened to full capacity every morning.

  • Transportation

    I-70 Floyd Hill Project

    I-70, Floyd Hill to the Veterans Memorial Tunnels (MP 241 to 248), Clear Creek County, CO

    Vivid Engineering Group provides construction inspection for CDOT's $905 million rebuild of eight miles of I-70 between Floyd Hill and the Veterans Memorial Tunnels. Inspectors verify drilled shafts, bridge construction, rock excavation, retaining walls, earthwork, paving, and drainage under live traffic. The project adds a westbound Express Lane, realigns the highway, replaces bridges, builds a frontage road, and improves interchanges and the Clear Creek Greenway.

  • Transportation

    Military Access, Mobility & Safety Improvement Project

    South Academy Boulevard widening and Pikes Peak region corridors, El Paso County, CO

    The Military Access, Mobility & Safety Improvement Project (MAMSIP) is a $161 million, five-year program to improve the corridors connecting Fort Carson, Peterson Space Force Base, Schriever Space Force Base, and Cheyenne Mountain Space Force Station — funded by CDOT, El Paso County, the Pikes Peak Rural Transportation Authority, and an $18.35 million federal BUILD grant. Built by SEMA Construction from June 2021 to July 2026, the program delivered safety improvements and a jug-handle intersection on CO 94; a full rebuild of Charter Oak Ranch Road with a new roundabout at Santa Fe Avenue; 7.5 miles of I-25 work between South Academy Boulevard and Fountain, including two replacement bridges, a concrete overlay, and a full-length median barrier; and finally the widening of South Academy Boulevard from two to three lanes in each direction, with bridge widening over Fountain Creek, US 85/87, and Bradley Road. Vivid Engineering served as the lead materials quality assurance testing firm for the program, overseeing all materials documentation, field testing, and inspection — including the South Academy Boulevard widening in El Paso County — to verify that every element met CDOT and FHWA standards for safety and durability.