Contact Us

Markets we serve

Transportation

Highways, interchanges, and bridges for CDOT and design-build teams.

Transportation

Built for CDOT and local-agency work

Transportation is where Vivid Engineering Group started and where most of our people spend their days. We provide construction inspection, owner acceptance (OA) testing, and quality assurance administration on projects ranging from a single interchange to multi-year, design-build corridors like Central 70, the I-25 South Gap, and the I-70 Floyd Hill project. Our inspectors are certified to the CDOT, WAQTC, ACI, and CAPA standards the specifications require, and our three AASHTO-accredited laboratories in Colorado Springs, Denver, and Pueblo West turn around soils, concrete, and asphalt results while they can still affect the work.

We serve the work from both sides of the table. For CDOT and municipal owners we act as the agency’s eyes in the field — documenting pay quantities, verifying materials, and keeping the project’s testing checklist current for audit. For general contractors we provide the independent process-control and acceptance testing that keeps a paving or structures schedule moving. Either way, the deliverable is the same: a project record the owner can accept and a finished facility built to plan.

Beyond the field, our geotechnical engineers provide subsurface investigations, pavement design, and retaining wall and bridge foundation recommendations, and our environmental staff support NEPA clearance, materials management, and stormwater compliance on the same corridors.

How We Work

  • Services

    Construction inspection, owner acceptance (OA) testing, QA/QC administration, laboratory testing, geotechnical and pavement engineering, environmental compliance

  • Clients include

    Colorado Department of Transportation, FHWA Central Federal Lands, cities and counties, design-build teams and general contractors

  • Delivery methods

    Design-bid-build, design-build, CM/GC, on-call and task-order contracts

  • Certifications

    CDOT, WAQTC, ACI, CAPA, ICC; AASHTO-accredited laboratories

  • Projects

    17projects on the project map

  • Talk to our team

What we bring

Services on transportation work

All services

Featured work

Recent transportation work

All projects
  • Transportation

    Military Access, Mobility & Safety Improvement Project

    South Academy Boulevard widening and Pikes Peak region corridors, El Paso County, CO

    The Military Access, Mobility & Safety Improvement Project (MAMSIP) is a $161 million, five-year program to improve the corridors connecting Fort Carson, Peterson Space Force Base, Schriever Space Force Base, and Cheyenne Mountain Space Force Station — funded by CDOT, El Paso County, the Pikes Peak Rural Transportation Authority, and an $18.35 million federal BUILD grant. Built by SEMA Construction from June 2021 to July 2026, the program delivered safety improvements and a jug-handle intersection on CO 94; a full rebuild of Charter Oak Ranch Road with a new roundabout at Santa Fe Avenue; 7.5 miles of I-25 work between South Academy Boulevard and Fountain, including two replacement bridges, a concrete overlay, and a full-length median barrier; and finally the widening of South Academy Boulevard from two to three lanes in each direction, with bridge widening over Fountain Creek, US 85/87, and Bradley Road. Vivid Engineering served as the lead materials quality assurance testing firm for the program, overseeing all materials documentation, field testing, and inspection — including the South Academy Boulevard widening in El Paso County — to verify that every element met CDOT and FHWA standards for safety and durability.

  • Transportation

    Ridgegate Parkway Widening

    RidgeGate Parkway, I-25 to Meridian Village Parkway, Lone Tree, CO 80124

    RidgeGate Parkway is the spine of Lone Tree's fast-growing RidgeGate development, linking I-25 and the Lone Tree City Center to the neighborhoods east of the interstate. To keep pace with that growth, the RidgeGate Parkway Widening Project expanded the corridor between I-25 and Meridian Village Parkway to add two through-lanes in each direction, including a split-alignment section, new bridges over Badger Gulch and Happy Canyon Creek, 8-foot pedestrian sidewalks, and a 12-foot cycle track running the length of the project. Partnering with Hamilton, Vivid Engineering provided construction field and laboratory materials testing for soils, concrete, and asphalt throughout the project. Our technicians tested embankment and backfill compaction, structural concrete for the new bridges, and asphalt paving as the corridor was built out, verifying that every element met the project's quality standards and giving the contractor results on the schedule the work demanded.

Other markets

Where else we work

All markets

Start a conversation

Staffing a CDOT or local-agency project?

Our inspectors and labs cover the Front Range from Fort Collins to Pueblo and the I-70 mountain corridor. Let's talk about your scope and schedule.