2C Road Improvement

Transportation

Keeping a citywide repaving promise.

In 2015, Colorado Springs voters approved the 2C sales tax to tackle a backlog of failing streets, and they renewed it in 2019 and again in 2024. Since the program began in 2016 it has repaved more than 1,900 lane miles, rebuilt roughly 400 miles of curb and gutter, and installed thousands of new and retrofitted pedestrian ramps across the city — one of the largest sustained paving efforts in Colorado, with about half of every dollar going to the concrete beside the road.

Vivid Engineering serves as one of the lead quality assurance testing firms for the program’s concrete and asphalt work. Our technicians test and document paving, sidewalks, curbs, gutters, and pedestrian ramps across each year’s project list, verifying that every placement meets City specifications. That oversight protects the long-term durability of the investment and helps the City deliver smoother streets and better accessibility, year after year.

Project Details

  • Client

    City of Colorado Springs

  • Location

    Colorado Springs

  • Timeline

    2016 – present

  • Sector

    Transportation

  • Services

    Construction Inspection & Testing

  • Transportation

    Circle Drive Bridges Replacement Project

    Circle Drive, Janitell Road to Monterey Road, Colorado Springs, CO

    Four bridges built in 1963 carry South Circle Drive more than 60 feet above Fountain Creek, the BNSF Railway, Las Vegas Street, Hancock Expressway, and the Pikes Peak Greenway Trail — a critical link between I-25 and southeast Colorado Springs. After a life-cycle cost analysis, the City chose full replacement over rehabilitation. The PPRTA-funded Circle Drive Bridges Replacement Project, built by SEMA Construction, began in fall 2023 and is replacing all four 800-foot structures in phases: new eastbound bridges first, alongside the originals, then new westbound bridges once traffic shifts — all while keeping two lanes open in each direction. The project also adds a sidewalk connection to the Greenway Trail and bike and pedestrian improvements on Hancock Expressway. Vivid Engineering leads quality assurance testing and supports the inspection team for the project, testing structural concrete, soils and backfill, and asphalt through each construction phase so that the new bridges meet City and CDOT standards for the next 60 years.

  • Transportation

    30th Street Corridor

    30th Street, Fontanero Street to Garden of the Gods Road, Colorado Springs, CO

    30th Street is the main route into Garden of the Gods Park, carrying park visitors, neighborhood traffic, and cyclists on a narrow, winding two-lane road with little margin for error. The City of Colorado Springs' 30th Street Corridor Improvement Project rebuilt roughly three miles between Mesa Road and Fontanero Street: widening the roadway with paved multi-use shoulders, adding a roundabout at Gateway Road, upgrading intersections, building a pedestrian underpass, and installing a new storm sewer system with a water quality pond. More than 2,000 feet of retaining walls and 6,300 feet of soldier pile were needed to hold the widened road on the hillside. Vivid Engineering led quality assurance testing and served on the construction inspection team for the project, verifying soils, concrete, and asphalt — including some 14,000 tons of asphalt and 21,000 feet of curb and gutter — against project specifications. The improvements strengthened emergency access and evacuation routes and created safer travel for motorists, cyclists, and pedestrians on the way into one of the region's most visited parks.

  • Transportation

    I-25/Cimarron Interchange Design Build

    I-25 and Cimarron Street (US 24) interchange, Colorado Springs, CO

    The I-25/Cimarron Street (US 24) interchange is the gateway to downtown Colorado Springs and one of the busiest junctions in the Pikes Peak region. Decades of poor roadway performance — settlement of embankments and walls on soft soils along Fountain Creek — had made it a persistent maintenance problem. CDOT's $77 million design-build reconstruction, delivered with Kraemer North America, completely rebuilt the interchange: new bridge foundations and bridges, new embankments, numerous MSE retaining walls, temporary and permanent pavements, improvements to the major drainages, and culvert and jack-and-bore utility installations. Vivid Engineering supported the project with quality oversight, construction inspection and materials testing, geotechnical design, and structural fill monitoring. Because of the corridor's history of settlement, significant analysis, design, and construction monitoring were performed to protect the new embankments and retaining walls — work grounded in our team's deep experience with DOT and FHWA design-build requirements, procedures, and specifications. The result is a modern interchange built to perform on ground that had troubled the corridor for decades.