Contact Us

Laboratory Materials Testing

Our Colorado Springs, Denver, and Pueblo West laboratories are accredited by the American Association of State Highway and Transportation Officials (AASHTO) and equipped to handle a wide range of testing — ensuring projects meet the highest standards of quality and safety.

Accredited testing for projects of all sizes.

Vivid Engineering’s Laboratory Materials Testing facilities are accredited by the American Association of State Highway and Transportation Officials (AASHTO) and equipped to handle a wide range of testing needs, including soils, concrete, asphalt, and aggregate testing.

Our highly experienced technicians, under the supervision of licensed Colorado Professional Engineers, ensure precision and reliability in every test. Vivid’s laboratories are accredited by both ASTM E-329-20 and AASHTO R-18, providing top-tier support for construction projects of all sizes.

At A Glance

  • Accreditation

    AASHTO R-18 and ASTM E-329-20

  • Supervised by

    Licensed Colorado Professional Engineers

  • Materials

    Soils, concrete, asphalt, and aggregate

  • Projects

    16 projects on the project map

  • Request a Quote

Our Capabilities

Soils Tests

  • Standard Proctor (D698, T99)
  • Modified Proctor (D1557, T180)
  • One Point Verification
  • Soil Moisture Content (D2216/T265)
  • Sieve Analysis with minus #200 (D6813, C136 and D1140/T27)
  • Minus #200 (D1140)
  • R-Value (D2844)
  • Atterberg Limits/Plasticity Index (D4318/T89 and T90)
  • Swell/Consolidation Test (D4546)
  • Swell/Consolidation Test, Shelby Tube or Remolded (D4546)
  • Water Soluble Sulfate Content
  • pH/Resistivity (D4972/T289)
  • Unconfined Compressive Strength (D2166/T208)
  • Unconfined Compressive Strength, Remolded (D2166/T208)
  • Specific Gravity (T100)
  • Direct Shear, Consolidated Undrained, 3-points (D3080)
  • Hydrometer, includes gradation and minus #200 wash and specific gravity (D422/T88)
  • California Bearing Ratio (D1883/T193)
  • Chloride
  • Redox
  • Mix Design: cement, fly ash, lime (D2166/T208)
  • Mix Design: curves, proctors, swells, breaks (D2166/T208)

Asphalt Tests

  • Asphalt Content by Ignition Oven with Gradation (D6307, T308 & D5444 and T30)
  • Specific Gravity (bulk) & Thickness (D1188, D2726)
  • Maximum Theoretical Specific Gravity, Rice (D2041, T209)
  • Lottman (D4867, T283)
  • Superpave Volumetric Properties (D6925, T312)
  • HVEEM Stability (D1660, T246)
  • Marshall, 3 Specimens with Stability and Flow (D1559)

Concrete & Masonry Tests

  • Cylinder Compression (C39, C1231, C31)
  • Cylinder Compression, Bonded Caps (C39, C617, C31)
  • Compressive Strength, Core (C42/T24)
  • Grout and Mortar Cube Compression (C780)
  • Prism Grout (C1019)
  • Masonry Prism, Hollow Core
  • Masonry Prism, Grout Filled

Aggregate Tests

  • Sieve Analysis with minus #200, Pit Run (C136)
  • Sieve Analysis with minus #200 (C136)
  • Minus #200 (C117)
  • Sand Equivalent (D2419, T176)
  • LA Abrasion (C131)
  • Specific Gravity and Absorption, Coarse or Fine (C127, C128)
  • Fractured Faces (D5821/T335)
  • Flat and Elongated (D4791)
  • Soundness of Aggregates (C88, T104)
  • Clay Lumps and Friable Particles (C142, T112)
  • Bulk Density & Voids (C29, T19)
  • Organic Impurities (C40, T21)

Asbestos, Mold & Lead Testing

  • PLM Analysis
  • PLM Point Count
  • TEM Analysis
  • Mold Bulk/Spore Trap
  • Lead Air Samples (ICP/AES)
  • Lead
  • Lead Waste (RCRA 8 TCLP)
  • X-Ray Fluorescence
  • Transportation

    Military Access, Mobility & Safety Improvement Project

    South Academy Boulevard widening and Pikes Peak region corridors, El Paso County, CO

    The Military Access, Mobility & Safety Improvement Project (MAMSIP) is a $161 million, five-year program to improve the corridors connecting Fort Carson, Peterson Space Force Base, Schriever Space Force Base, and Cheyenne Mountain Space Force Station — funded by CDOT, El Paso County, the Pikes Peak Rural Transportation Authority, and an $18.35 million federal BUILD grant. Built by SEMA Construction from June 2021 to July 2026, the program delivered safety improvements and a jug-handle intersection on CO 94; a full rebuild of Charter Oak Ranch Road with a new roundabout at Santa Fe Avenue; 7.5 miles of I-25 work between South Academy Boulevard and Fountain, including two replacement bridges, a concrete overlay, and a full-length median barrier; and finally the widening of South Academy Boulevard from two to three lanes in each direction, with bridge widening over Fountain Creek, US 85/87, and Bradley Road. Vivid Engineering served as the lead materials quality assurance testing firm for the program, overseeing all materials documentation, field testing, and inspection — including the South Academy Boulevard widening in El Paso County — to verify that every element met CDOT and FHWA standards for safety and durability.

  • Transportation

    Ridgegate Parkway Widening

    RidgeGate Parkway, I-25 to Meridian Village Parkway, Lone Tree, CO 80124

    RidgeGate Parkway is the spine of Lone Tree's fast-growing RidgeGate development, linking I-25 and the Lone Tree City Center to the neighborhoods east of the interstate. To keep pace with that growth, the RidgeGate Parkway Widening Project expanded the corridor between I-25 and Meridian Village Parkway to add two through-lanes in each direction, including a split-alignment section, new bridges over Badger Gulch and Happy Canyon Creek, 8-foot pedestrian sidewalks, and a 12-foot cycle track running the length of the project. Partnering with Hamilton, Vivid Engineering provided construction field and laboratory materials testing for soils, concrete, and asphalt throughout the project. Our technicians tested embankment and backfill compaction, structural concrete for the new bridges, and asphalt paving as the corridor was built out, verifying that every element met the project's quality standards and giving the contractor results on the schedule the work demanded.

  • Transportation

    SH 7 Permanent Repairs Project

    CO 7, South St. Vrain Canyon, Lyons to Raymond (MP 19 to 33), Boulder County, CO

    The September 2013 flood devastated Colorado Highway 7 through the South St. Vrain Canyon, severely damaging or completely washing away nine miles of roadway and cutting off canyon access for two and a half months. Temporary repairs reopened the road, but a permanent fix had to wait. The SH 7 Permanent Repairs Project — the final permanent infrastructure project of Colorado's $750 million 2013 Flood Recovery Program, funded through FHWA Emergency Relief — permanently rebuilt 14 miles of the canyon between Lyons and Raymond. The $60 million project replaced temporary post-flood asphalt with a fully reconstructed roadway, restored 11,500 linear feet of St. Vrain Creek to a resilient natural channel, rebuilt embankments and drainage, added rockfall ditches and a four-foot uphill bicycle shoulder, and revegetated 28 acres of disturbed canyon — all while meeting a net-zero construction waste goal. Vivid Engineering Group worked alongside Kiewit Infrastructure Co. and CDOT Region 4 from September 2021 through November 2022, providing field and laboratory materials testing of soils, aggregates, concrete, and asphalt to verify that every material placed met CDOT standards — including the 38,500 tons of asphalt that make up the new canyon roadway. In a narrow canyon with a single access road and an active creek restoration underway, Vivid's technicians kept sampling and testing on the contractor's schedule so the corridor could reopen as planned.

Other services

More ways we support your project

All services

Have a project in mind that we can help out with?

Send us the site, the schedule, and what you know so far, and we'll be in touch with some additional details as soon as possible.