30th Street Corridor

Transportation

A safer road to Garden of the Gods.

30th Street is the main route into Garden of the Gods Park, carrying park visitors, neighborhood traffic, and cyclists on a narrow, winding two-lane road with little margin for error. The City of Colorado Springs’ 30th Street Corridor Improvement Project rebuilt roughly three miles between Mesa Road and Fontanero Street: widening the roadway with paved multi-use shoulders, adding a roundabout at Gateway Road, upgrading intersections, building a pedestrian underpass, and installing a new storm sewer system with a water quality pond. More than 2,000 feet of retaining walls and 6,300 feet of soldier pile were needed to hold the widened road on the hillside.

Vivid Engineering led quality assurance testing and served on the construction inspection team for the project, verifying soils, concrete, and asphalt — including some 14,000 tons of asphalt and 21,000 feet of curb and gutter — against project specifications. The improvements strengthened emergency access and evacuation routes and created safer travel for motorists, cyclists, and pedestrians on the way into one of the region’s most visited parks.

Project Details

  • Client

    City of Colorado Springs

  • Contractor

    Wildcat Construction

  • Location

    30th Street, Mesa Road to Fontanero Street – Colorado Springs, CO

  • Timeline

    October 2021 – September 2023

  • Sector

    Transportation

  • Services

    Construction Inspection & Testing

  • Transportation

    2C Road Improvement

    Citywide road program, Colorado Springs, CO

    In 2015, Colorado Springs voters approved the 2C sales tax to tackle a backlog of failing streets, and they renewed it in 2019 and again in 2024. Since the program began in 2016 it has repaved more than 1,900 lane miles, rebuilt roughly 400 miles of curb and gutter, and installed thousands of new and retrofitted pedestrian ramps across the city — one of the largest sustained paving efforts in Colorado, with about half of every dollar going to the concrete beside the road. Vivid Engineering serves as one of the lead quality assurance testing firms for the program's concrete and asphalt work. Our technicians test and document paving, sidewalks, curbs, gutters, and pedestrian ramps across each year's project list, verifying that every placement meets City specifications. That oversight protects the long-term durability of the investment and helps the City deliver smoother streets and better accessibility, year after year.

  • Transportation

    SH 7 Permanent Repairs Project

    CO 7, South St. Vrain Canyon, Lyons to Raymond (MP 19 to 33), Boulder County, CO

    The September 2013 flood devastated Colorado Highway 7 through the South St. Vrain Canyon, severely damaging or completely washing away nine miles of roadway and cutting off canyon access for two and a half months. Temporary repairs reopened the road, but a permanent fix had to wait. The SH 7 Permanent Repairs Project — the final permanent infrastructure project of Colorado's $750 million 2013 Flood Recovery Program, funded through FHWA Emergency Relief — permanently rebuilt 14 miles of the canyon between Lyons and Raymond. The $60 million project replaced temporary post-flood asphalt with a fully reconstructed roadway, restored 11,500 linear feet of St. Vrain Creek to a resilient natural channel, rebuilt embankments and drainage, added rockfall ditches and a four-foot uphill bicycle shoulder, and revegetated 28 acres of disturbed canyon — all while meeting a net-zero construction waste goal. Vivid Engineering Group worked alongside Kiewit Infrastructure Co. and CDOT Region 4 from September 2021 through November 2022, providing field and laboratory materials testing of soils, aggregates, concrete, and asphalt to verify that every material placed met CDOT standards — including the 38,500 tons of asphalt that make up the new canyon roadway. In a narrow canyon with a single access road and an active creek restoration underway, Vivid's technicians kept sampling and testing on the contractor's schedule so the corridor could reopen as planned.

  • Transportation

    CO 119 Safety, Mobility & Bikeway Project

    CO 119 (Diagonal Highway), Foothills Parkway in Boulder to Hover Street in Longmont

    CO 119 — the Diagonal Highway — is Boulder County's busiest commuter corridor, linking Boulder and Longmont across 10 miles of open farmland and a growing string of intersections. CDOT's $165 million CO 119 Safety, Mobility & Bikeway Project, delivered in two construction packages with Kraemer North America and funded by CDOT, RTD, Boulder County, and a 2023 federal RAISE grant, is reshaping the corridor from Foothills Parkway to Hover Street. The project adds a separated commuter bikeway running the length of the highway, with four underpasses at CO 119, Niwot Road, CO 52, and Jay Road and an overpass at 63rd Street; new Bus Rapid Transit infrastructure and Park-n-Ride facilities; a reconfigured CO 52 intersection; and safety improvements at intersections along the route. Construction began in September 2024, with completion expected in spring 2027 — all while the highway stays open to the tens of thousands of commuters who depend on it every day. Vivid Engineering Group provides field and laboratory materials testing across both construction packages, working alongside Kraemer and CDOT Region 4. Our technicians sample and test soils, aggregate base course, concrete paving (PCCP), structural concrete for bridge decks, caissons, and drainage structures, and asphalt, performing CDOT owner acceptance sampling and testing to verify that every material placed meets specification, with samples run through Vivid's AASHTO-accredited Colorado laboratories. On site since 2024, the team has supported early-morning fast-track paving pours, bridge deck placements, caisson pours, and embankment work — keeping acceptance testing and documentation moving at the pace of one of the fastest-moving corridor projects in the state.