I-70 Floyd Hill to Chief Hosa Resurfacing

Transportation

Owner acceptance testing and inspection through 6.4 miles of night SMA paving on Colorado's mountain corridor.

  • $12.8MMountain Corridor Investment
  • 6.4 MIOf I-70 Milled & Repaved
  • SMAStone Matrix Asphalt, Tested On Site

Repaving the gateway to the Rockies – without closing it.

Between Floyd Hill and Chief Hosa, I-70 climbs through the Front Range foothills carrying ski traffic, freight, and daily commuters in and out of the mountains — and its pavement had reached the end of its life. CDOT’s $12.8 million resurfacing project rehabilitated 6.4 miles of the interstate (MP 246.5–252.9) through Jefferson and Clear Creek Counties, milling off deteriorated pavement and repaving both directions in stone matrix asphalt (SMA) — the durable, rut-resistant surfacing CDOT reserves for its hardest-working corridors. With no practical detour around this stretch of the mountains, contractor APC Construction completed all paving in a single season, almost entirely under nighttime lane closures, then returned the following season for guardrail replacement, culvert cleaning, signage, and striping.

Working directly for CDOT, Vivid Engineering Group provided construction inspection, QA/QC administration, and field and laboratory owner acceptance materials testing across the project. SMA is one of the most demanding mixes to test — gap-graded, fiber-stabilized, and unforgiving on volumetrics — so Vivid ran the entire laboratory acceptance program from its on-site field lab, turning results while the mat was still going down. Vivid inspectors and certified technicians worked the night closures alongside the paving crews, verifying mix temperatures, compaction, and placement in real time; high-altitude paving windows, mountain weather, and live interstate traffic made every shift count, and Vivid’s team kept acceptance testing and documentation moving on the contractor’s schedule so the corridor reopened to full capacity every morning.

Project Details

  • Client

    Colorado Department of Transportation (CDOT)

  • Contractor

    APC Construction Co. – a CRH Company

  • Location

    I-70 Mountain Corridor, Floyd Hill to Chief Hosa (MP 246.5-252.9) – Jefferson & Clear Creek Counties, CO

  • Project Value

    $12.8 million

  • Timeline

    Construction April 2022 – May 2023

  • Sector

    Transportation

  • Services

    Construction Inspection & Testing

  • Transportation

    Downtown Estes Loop Project

    Elkhorn Avenue, Moraine Avenue, and Riverside Drive, Estes Park, CO 80517

    Every year, millions of visitors funnel through downtown Estes Park on their way to Rocky Mountain National Park — and for decades, its two-way downtown streets could not keep up. The $42 million Downtown Estes Loop, administered by FHWA's Central Federal Lands Highway Division in partnership with CDOT and the Town of Estes Park, converted Elkhorn Avenue (US 36), Moraine Avenue, and Riverside Drive into a one-way couplet. The project built a new roundabout at Moraine and West Riverside, replaced the bridge over the Big Thompson River connecting East and West Riverside Drives, and delivered expanded stormwater infrastructure, floodplain mitigation, and new sidewalks and trails through the heart of downtown. Working for Flatiron, Vivid Engineering Group provided construction inspection plus field and laboratory materials testing of soils, aggregates, concrete, and asphalt across 21 months of construction, from January 2023 to October 2024. Building a federal-aid project through an operating tourist downtown meant compressed winter work windows and some of the toughest environmental restrictions on any Colorado project — with the Big Thompson River flowing directly through the work zone. Vivid's inspectors and technicians kept quality verification moving on the contractor's schedule, with samples run through our AASHTO-accredited Colorado laboratories, so that the Loop opened to traffic ahead of the next summer season.

  • Transportation

    Academy Boulevard Improvements

    South Academy Boulevard, Bijou Street to Airport Road, Colorado Springs, CO

    South Academy Boulevard is one of Colorado Springs' hardest-working arterials, and decades of heavy traffic had left its pavement, concrete, and drainage in poor condition. The City's $62.5 million South Academy Boulevard Improvements Project, funded through the voter-approved Pikes Peak Rural Transportation Authority, is rebuilding 18 lane miles in two segments — Bijou Street to Airport Road, and East Fountain Boulevard to Jet Wing Drive. The work replaces worn pavement and base, rebuilds curb and gutter, adds a multi-use path, relocates Colorado Springs Utilities water and wastewater lines, and installs new inlets, manholes, and storm pipe to end chronic standing water. Vivid Engineering leads quality assurance testing and is part of the inspection team for the project. Our technicians sample and test soils, aggregate base, concrete, and asphalt as each phase goes in, keeping results in the contractor's hands so work can keep moving through a corridor that stays open to traffic throughout construction. Segment 1 wrapped up in 2024, with the southern segment scheduled for completion in 2026.

  • Transportation

    SH 7 Permanent Repairs Project

    CO 7, South St. Vrain Canyon, Lyons to Raymond (MP 19 to 33), Boulder County, CO

    The September 2013 flood devastated Colorado Highway 7 through the South St. Vrain Canyon, severely damaging or completely washing away nine miles of roadway and cutting off canyon access for two and a half months. Temporary repairs reopened the road, but a permanent fix had to wait. The SH 7 Permanent Repairs Project — the final permanent infrastructure project of Colorado's $750 million 2013 Flood Recovery Program, funded through FHWA Emergency Relief — permanently rebuilt 14 miles of the canyon between Lyons and Raymond. The $60 million project replaced temporary post-flood asphalt with a fully reconstructed roadway, restored 11,500 linear feet of St. Vrain Creek to a resilient natural channel, rebuilt embankments and drainage, added rockfall ditches and a four-foot uphill bicycle shoulder, and revegetated 28 acres of disturbed canyon — all while meeting a net-zero construction waste goal. Vivid Engineering Group worked alongside Kiewit Infrastructure Co. and CDOT Region 4 from September 2021 through November 2022, providing field and laboratory materials testing of soils, aggregates, concrete, and asphalt to verify that every material placed met CDOT standards — including the 38,500 tons of asphalt that make up the new canyon roadway. In a narrow canyon with a single access road and an active creek restoration underway, Vivid's technicians kept sampling and testing on the contractor's schedule so the corridor could reopen as planned.