I-70 Floyd Hill Project

Transportation

Construction inspection on CDOT's $905 million rebuild of eight miles of I-70 from Floyd Hill to the Veterans Memorial Tunnels.

  • $905MCorridor Investment
  • 8 MIOf I-70 Rebuilt
  • 3 NEWInterchange Roundabouts

Rebuilding the mountain corridor's toughest eight miles.

Where I-70 drops off Floyd Hill and threads Clear Creek Canyon to the Veterans Memorial Tunnels, the interstate narrows, curves, and climbs some of the steepest grades on the mountain corridor – a bottleneck for ski traffic, freight, and every trip between Denver and the high country. CDOT’s $905 million I-70 Floyd Hill Project is rebuilding eight miles of the corridor (MP 241-248) through Clear Creek County: adding a third westbound lane that will operate as a tolled Express Lane, realigning the highway for better sight distance, replacing worn bridges – including an elevated section carrying westbound traffic through the canyon – building a two-mile frontage road between the US 6 and Hidden Valley interchanges, adding roundabouts at three interchange locations, and improving the Clear Creek Greenway below. Design-build contractor Kraemer North America broke ground in 2023, with westbound traffic slated for its new alignment in 2027 and full completion in 2029.

Working directly for CDOT, Vivid Engineering Group provides construction inspection on the project – verifying that the work going in the ground matches the plans and specifications on one of the most complex active corridors in the state. Vivid inspectors cover the full range of heavy-civil operations: drilled shafts and pier columns rising out of the canyon floor, girder erection and bridge deck placements, rock excavation and retaining walls, earthwork, paving, and drainage – all built under live interstate traffic in a narrow canyon shared with Clear Creek and the greenway. It’s exactly the kind of high-stakes, high-country work Vivid’s inspection team was built for.

Project Details

  • Client

    Colorado Department of Transportation (CDOT)

  • Contractor

    Kraemer North America (design-build)

  • Location

    I-70 Mountain Corridor, Floyd Hill to the Veterans Memorial Tunnels (MP 241-248) – Clear Creek County, CO

  • Project Value

    $905 million

  • Timeline

    Construction 2023 – 2029 (westbound traffic on its new alignment in 2027)

  • Sector

    Transportation

  • Services

    Construction Inspection & Testing

  • Transportation

    Cañon City's 2A Street Repair

    1st Street and Main Street, Cañon City, CO 81212

    In November 2016, Cañon City voters approved Referendum 2A, a one-percent sales tax dedicated entirely to repairing and replacing the city's streets. The 2024 program year was one of the largest to date: a $6.55 million slate that included full reconstruction of 1st and Main Street from US 50 to 4th Street and Pear Avenue from 19th Street to Field Avenue, along with resurfacing of 5th Street between Fairview Avenue and High Street and Harrison Avenue between 9th and 15th Streets. Year by year, the 2A program has worked through the roughly two-thirds of city streets once rated in poor condition. Vivid Engineering served as project manager and the inspection and testing lead for the 2024 work — managing construction on the City's behalf, inspecting reconstruction and paving operations, and testing soils, aggregates, concrete, and asphalt against project specifications. The result is a set of rebuilt downtown streets that meet national standards and will serve Cañon City for decades.

  • Transportation

    Academy Boulevard Improvements

    South Academy Boulevard, Bijou Street to Airport Road, Colorado Springs, CO

    South Academy Boulevard is one of Colorado Springs' hardest-working arterials, and decades of heavy traffic had left its pavement, concrete, and drainage in poor condition. The City's $62.5 million South Academy Boulevard Improvements Project, funded through the voter-approved Pikes Peak Rural Transportation Authority, is rebuilding 18 lane miles in two segments — Bijou Street to Airport Road, and East Fountain Boulevard to Jet Wing Drive. The work replaces worn pavement and base, rebuilds curb and gutter, adds a multi-use path, relocates Colorado Springs Utilities water and wastewater lines, and installs new inlets, manholes, and storm pipe to end chronic standing water. Vivid Engineering leads quality assurance testing and is part of the inspection team for the project. Our technicians sample and test soils, aggregate base, concrete, and asphalt as each phase goes in, keeping results in the contractor's hands so work can keep moving through a corridor that stays open to traffic throughout construction. Segment 1 wrapped up in 2024, with the southern segment scheduled for completion in 2026.

  • Transportation

    SH 7 Permanent Repairs Project

    CO 7, South St. Vrain Canyon, Lyons to Raymond (MP 19 to 33), Boulder County, CO

    The September 2013 flood devastated Colorado Highway 7 through the South St. Vrain Canyon, severely damaging or completely washing away nine miles of roadway and cutting off canyon access for two and a half months. Temporary repairs reopened the road, but a permanent fix had to wait. The SH 7 Permanent Repairs Project — the final permanent infrastructure project of Colorado's $750 million 2013 Flood Recovery Program, funded through FHWA Emergency Relief — permanently rebuilt 14 miles of the canyon between Lyons and Raymond. The $60 million project replaced temporary post-flood asphalt with a fully reconstructed roadway, restored 11,500 linear feet of St. Vrain Creek to a resilient natural channel, rebuilt embankments and drainage, added rockfall ditches and a four-foot uphill bicycle shoulder, and revegetated 28 acres of disturbed canyon — all while meeting a net-zero construction waste goal. Vivid Engineering Group worked alongside Kiewit Infrastructure Co. and CDOT Region 4 from September 2021 through November 2022, providing field and laboratory materials testing of soils, aggregates, concrete, and asphalt to verify that every material placed met CDOT standards — including the 38,500 tons of asphalt that make up the new canyon roadway. In a narrow canyon with a single access road and an active creek restoration underway, Vivid's technicians kept sampling and testing on the contractor's schedule so the corridor could reopen as planned.