Ridgegate Parkway Widening

Transportation

Widening a corridor for a growing Lone Tree.

RidgeGate Parkway is the spine of Lone Tree’s fast-growing RidgeGate development, linking I-25 and the Lone Tree City Center to the neighborhoods east of the interstate. To keep pace with that growth, the RidgeGate Parkway Widening Project expanded the corridor between I-25 and Meridian Village Parkway to add two through-lanes in each direction, including a split-alignment section, new bridges over Badger Gulch and Happy Canyon Creek, 8-foot pedestrian sidewalks, and a 12-foot cycle track running the length of the project.

Partnering with Hamilton, Vivid Engineering provided construction field and laboratory materials testing for soils, concrete, and asphalt throughout the project. Our technicians tested embankment and backfill compaction, structural concrete for the new bridges, and asphalt paving as the corridor was built out, verifying that every element met the project’s quality standards and giving the contractor results on the schedule the work demanded.

Project Details

  • Client

    Hamilton

  • Location

    Lone Tree, CO; RidgeGate Parkway between I-25 and Meridian Village Parkway

  • Timeline

    2019 – 2020

  • Sector

    Transportation

  • Services

    Construction Inspection & Testing

  • Transportation

    Circle Drive Bridges Replacement Project

    Circle Drive, Janitell Road to Monterey Road, Colorado Springs, CO

    Four bridges built in 1963 carry South Circle Drive more than 60 feet above Fountain Creek, the BNSF Railway, Las Vegas Street, Hancock Expressway, and the Pikes Peak Greenway Trail — a critical link between I-25 and southeast Colorado Springs. After a life-cycle cost analysis, the City chose full replacement over rehabilitation. The PPRTA-funded Circle Drive Bridges Replacement Project, built by SEMA Construction, began in fall 2023 and is replacing all four 800-foot structures in phases: new eastbound bridges first, alongside the originals, then new westbound bridges once traffic shifts — all while keeping two lanes open in each direction. The project also adds a sidewalk connection to the Greenway Trail and bike and pedestrian improvements on Hancock Expressway. Vivid Engineering leads quality assurance testing and supports the inspection team for the project, testing structural concrete, soils and backfill, and asphalt through each construction phase so that the new bridges meet City and CDOT standards for the next 60 years.

  • Transportation

    I-25 South Gap Project: Monument To Castle Rock

    I-25, Monument to Castle Rock, CO (18 miles)

    For years, the 18-mile stretch of I-25 between Monument and Castle Rock was the only four-lane section left between Denver and Colorado Springs — a congested, crash-prone bottleneck known simply as "the Gap." CDOT's $350 million I-25 South Gap Project, delivered through the CM/GC method with Kraemer North America, widened the interstate to three lanes in each direction with a new express lane, reconstructed five bridges, extended ramps, built five wildlife crossings to reduce animal-vehicle collisions, and placed a new pavement overlay along the full length of the corridor. Construction ran from 2018 through 2022. Partnering with Rocksol Consulting Group, Vivid Engineering provided owner's acceptance inspection and materials testing for CDOT on the project. Vivid inspectors and technicians covered drainage features, retaining walls, bridge structures — including caisson and bedrock observations at the new bridge foundations — and pavements, along with test pits and DCP testing to confirm subgrade conditions, verifying that the work met CDOT's standards on one of the most heavily traveled corridors in the state.

  • Transportation

    CO 119 Safety, Mobility & Bikeway Project

    CO 119 (Diagonal Highway), Foothills Parkway in Boulder to Hover Street in Longmont

    CO 119 — the Diagonal Highway — is Boulder County's busiest commuter corridor, linking Boulder and Longmont across 10 miles of open farmland and a growing string of intersections. CDOT's $165 million CO 119 Safety, Mobility & Bikeway Project, delivered in two construction packages with Kraemer North America and funded by CDOT, RTD, Boulder County, and a 2023 federal RAISE grant, is reshaping the corridor from Foothills Parkway to Hover Street. The project adds a separated commuter bikeway running the length of the highway, with four underpasses at CO 119, Niwot Road, CO 52, and Jay Road and an overpass at 63rd Street; new Bus Rapid Transit infrastructure and Park-n-Ride facilities; a reconfigured CO 52 intersection; and safety improvements at intersections along the route. Construction began in September 2024, with completion expected in spring 2027 — all while the highway stays open to the tens of thousands of commuters who depend on it every day. Vivid Engineering Group provides field and laboratory materials testing across both construction packages, working alongside Kraemer and CDOT Region 4. Our technicians sample and test soils, aggregate base course, concrete paving (PCCP), structural concrete for bridge decks, caissons, and drainage structures, and asphalt, performing CDOT owner acceptance sampling and testing to verify that every material placed meets specification, with samples run through Vivid's AASHTO-accredited Colorado laboratories. On site since 2024, the team has supported early-morning fast-track paving pours, bridge deck placements, caisson pours, and embankment work — keeping acceptance testing and documentation moving at the pace of one of the fastest-moving corridor projects in the state.

Have a project with conditions like these?

Talk with the engineers and inspectors who work on projects just like this every day.