I-25 South Gap Project: Monument To Castle Rock

Transportation

Closing the Gap on Colorado's busiest interstate.

For years, the 18-mile stretch of I-25 between Monument and Castle Rock was the only four-lane section left between Denver and Colorado Springs — a congested, crash-prone bottleneck known simply as “the Gap.” CDOT’s $350 million I-25 South Gap Project, delivered through the CM/GC method with Kraemer North America, widened the interstate to three lanes in each direction with a new express lane, reconstructed five bridges, extended ramps, built five wildlife crossings to reduce animal-vehicle collisions, and placed a new pavement overlay along the full length of the corridor. Construction ran from 2018 through 2022.

Partnering with Rocksol Consulting Group, Vivid Engineering provided owner’s acceptance inspection and materials testing for CDOT on the project. Vivid inspectors and technicians covered drainage features, retaining walls, bridge structures — including caisson and bedrock observations at the new bridge foundations — and pavements, along with test pits and DCP testing to confirm subgrade conditions, verifying that the work met CDOT’s standards on one of the most heavily traveled corridors in the state.

Project Details

  • Client

    Rocksol Consulting Group

  • Location

    I-25, Monument to Castle Rock – Douglas & El Paso Counties, CO

  • Project Value

    $350 million

  • Timeline

    Construction 2018 – 2022

  • Sector

    Transportation

  • Services

    Construction Inspection & Testing

  • Transportation

    Central 70 Project

    I-70, Brighton Boulevard to Chambers Road, Denver, CO

    Central 70 was the largest project in CDOT's history: a $1.2 billion reconstruction of 10 miles of Interstate 70 between Brighton Boulevard and Chambers Road, a corridor that carries more than 200,000 vehicles a day and supports some 1,200 businesses. The project added a new express lane in each direction, removed a 56-year-old viaduct, lowered the interstate between Brighton and Colorado Boulevards, and built a four-acre park over the highway to reconnect the Elyria-Swansea neighborhood to the rest of the city. Working alongside Kiewit Infrastructure Co., Vivid Engineering provided process control and field and laboratory materials testing for the project. Our technicians tested soils, concrete, asphalt, masonry, shotcrete, and aggregates throughout construction, verifying that every material placed met CDOT's quality standards on one of the most complex urban highway builds in the country.

  • Transportation

    Cañon City's 2A Street Repair

    1st Street and Main Street, Cañon City, CO 81212

    In November 2016, Cañon City voters approved Referendum 2A, a one-percent sales tax dedicated entirely to repairing and replacing the city's streets. The 2024 program year was one of the largest to date: a $6.55 million slate that included full reconstruction of 1st and Main Street from US 50 to 4th Street and Pear Avenue from 19th Street to Field Avenue, along with resurfacing of 5th Street between Fairview Avenue and High Street and Harrison Avenue between 9th and 15th Streets. Year by year, the 2A program has worked through the roughly two-thirds of city streets once rated in poor condition. Vivid Engineering served as project manager and the inspection and testing lead for the 2024 work — managing construction on the City's behalf, inspecting reconstruction and paving operations, and testing soils, aggregates, concrete, and asphalt against project specifications. The result is a set of rebuilt downtown streets that meet national standards and will serve Cañon City for decades.