I-25/Cimarron Interchange Design Build

Transportation

Rebuilding the gateway to downtown Colorado Springs.

The I-25/Cimarron Street (US 24) interchange is the gateway to downtown Colorado Springs and one of the busiest junctions in the Pikes Peak region. Decades of poor roadway performance — settlement of embankments and walls on soft soils along Fountain Creek — had made it a persistent maintenance problem. CDOT’s $77 million design-build reconstruction, delivered with Kraemer North America, completely rebuilt the interchange: new bridge foundations and bridges, new embankments, numerous MSE retaining walls, temporary and permanent pavements, improvements to the major drainages, and culvert and jack-and-bore utility installations.

Vivid Engineering supported the project with quality oversight, construction inspection and materials testing, geotechnical design, and structural fill monitoring. Because of the corridor’s history of settlement, significant analysis, design, and construction monitoring were performed to protect the new embankments and retaining walls — work grounded in our team’s deep experience with DOT and FHWA design-build requirements, procedures, and specifications. The result is a modern interchange built to perform on ground that had troubled the corridor for decades.

Project Details

  • Client

    Kraemer North America

  • Location

    I-25 & Cimarron Street (US 24) – Colorado Springs, CO

  • Project Value

    $77M

  • Sector

    Transportation

  • Services

    Construction Inspection & Testing

  • Transportation

    I-70 Floyd Hill Project

    I-70, Floyd Hill to the Veterans Memorial Tunnels (MP 241 to 248), Clear Creek County, CO

    Vivid Engineering Group provides construction inspection for CDOT's $905 million rebuild of eight miles of I-70 between Floyd Hill and the Veterans Memorial Tunnels. Inspectors verify drilled shafts, bridge construction, rock excavation, retaining walls, earthwork, paving, and drainage under live traffic. The project adds a westbound Express Lane, realigns the highway, replaces bridges, builds a frontage road, and improves interchanges and the Clear Creek Greenway.

  • Transportation

    Circle Drive Bridges Replacement Project

    Circle Drive, Janitell Road to Monterey Road, Colorado Springs, CO

    Four bridges built in 1963 carry South Circle Drive more than 60 feet above Fountain Creek, the BNSF Railway, Las Vegas Street, Hancock Expressway, and the Pikes Peak Greenway Trail — a critical link between I-25 and southeast Colorado Springs. After a life-cycle cost analysis, the City chose full replacement over rehabilitation. The PPRTA-funded Circle Drive Bridges Replacement Project, built by SEMA Construction, began in fall 2023 and is replacing all four 800-foot structures in phases: new eastbound bridges first, alongside the originals, then new westbound bridges once traffic shifts — all while keeping two lanes open in each direction. The project also adds a sidewalk connection to the Greenway Trail and bike and pedestrian improvements on Hancock Expressway. Vivid Engineering leads quality assurance testing and supports the inspection team for the project, testing structural concrete, soils and backfill, and asphalt through each construction phase so that the new bridges meet City and CDOT standards for the next 60 years.

Have a project with conditions like these?

Talk with the engineers and inspectors who work on projects just like this every day.