Owner's representative for a decade of street repair.

In November 2016, Cañon City voters approved Referendum 2A, a one-percent sales tax increase dedicated exclusively to contracting out street repair and replacement. The tax generates an average of $3.5 million a year across a 10-year program — $9 million of design-build work in the first year, 2017, followed by annual design-bid-build programs every year since.

Vivid serves as the City’s prime consultant and owner’s representative for the program. Our team performs geotechnical investigations; prepares pavement designs for composite pavement, full-depth reclamation, and asphalt and concrete mill-and-overlay; and delivers civil plans and specifications covering roadway plan and profile, utility relocations, drainage, streetscape and ADA compliance, Safe Routes to School, stormwater management, quantities, and engineer’s estimates, with Wilson & Company preparing civil plans as a subconsultant. Vivid supports bid document preparation, bid award, and pre-construction meetings, then serves as construction engineer through the build — providing construction inspection, quality management, and materials testing on every project. The result is a program that has steadily rebuilt the streets Cañon City residents voted to fix.

Project Details

  • Client

    City of Cañon City

  • Project Value

    Average $3.5 million per year over 10 years

  • Timeline

    10-year program, approved November 2016

  • Sector

    Transportation

  • Services

    Construction Inspection & Testing

  • Transportation

    Academy Boulevard Improvements

    South Academy Boulevard, Bijou Street to Airport Road, Colorado Springs, CO

    South Academy Boulevard is one of Colorado Springs' hardest-working arterials, and decades of heavy traffic had left its pavement, concrete, and drainage in poor condition. The City's $62.5 million South Academy Boulevard Improvements Project, funded through the voter-approved Pikes Peak Rural Transportation Authority, is rebuilding 18 lane miles in two segments — Bijou Street to Airport Road, and East Fountain Boulevard to Jet Wing Drive. The work replaces worn pavement and base, rebuilds curb and gutter, adds a multi-use path, relocates Colorado Springs Utilities water and wastewater lines, and installs new inlets, manholes, and storm pipe to end chronic standing water. Vivid Engineering leads quality assurance testing and is part of the inspection team for the project. Our technicians sample and test soils, aggregate base, concrete, and asphalt as each phase goes in, keeping results in the contractor's hands so work can keep moving through a corridor that stays open to traffic throughout construction. Segment 1 wrapped up in 2024, with the southern segment scheduled for completion in 2026.

  • Transportation

    Central 70 Project

    I-70, Brighton Boulevard to Chambers Road, Denver, CO

    Central 70 was the largest project in CDOT's history: a $1.2 billion reconstruction of 10 miles of Interstate 70 between Brighton Boulevard and Chambers Road, a corridor that carries more than 200,000 vehicles a day and supports some 1,200 businesses. The project added a new express lane in each direction, removed a 56-year-old viaduct, lowered the interstate between Brighton and Colorado Boulevards, and built a four-acre park over the highway to reconnect the Elyria-Swansea neighborhood to the rest of the city. Working alongside Kiewit Infrastructure Co., Vivid Engineering provided process control and field and laboratory materials testing for the project. Our technicians tested soils, concrete, asphalt, masonry, shotcrete, and aggregates throughout construction, verifying that every material placed met CDOT's quality standards on one of the most complex urban highway builds in the country.

  • Transportation

    Circle Drive Bridges Replacement Project

    Circle Drive, Janitell Road to Monterey Road, Colorado Springs, CO

    Four bridges built in 1963 carry South Circle Drive more than 60 feet above Fountain Creek, the BNSF Railway, Las Vegas Street, Hancock Expressway, and the Pikes Peak Greenway Trail — a critical link between I-25 and southeast Colorado Springs. After a life-cycle cost analysis, the City chose full replacement over rehabilitation. The PPRTA-funded Circle Drive Bridges Replacement Project, built by SEMA Construction, began in fall 2023 and is replacing all four 800-foot structures in phases: new eastbound bridges first, alongside the originals, then new westbound bridges once traffic shifts — all while keeping two lanes open in each direction. The project also adds a sidewalk connection to the Greenway Trail and bike and pedestrian improvements on Hancock Expressway. Vivid Engineering leads quality assurance testing and supports the inspection team for the project, testing structural concrete, soils and backfill, and asphalt through each construction phase so that the new bridges meet City and CDOT standards for the next 60 years.